Runway Resurfacing

Posted: Mon Feb 29, 2016 3:17 pm
by markymash
According to this news report, resurfacing work will commence in March and is expected to take a year.

http://www.dailypost.co.uk/news/north-w ... s-10965094

Re: Runway Resurfacing

Posted: Sun Apr 24, 2016 8:58 am
by steve149c
Runway starts this Monday, so no R31 (Rhosneigr) or R13 (Fraggle Rock) for a while

Best viewing is 19 (spotters) or a long walk to 01 (beach). Please be aware that the beach end it can be hard to see the boundary fence due to shifting dunes and trespassing on the base will be quickly dealt with.

My suggestion is Fraggle Rock in the afternoon as the sun has moved around. R19 is very nice and some
Nice shots to be had.

Re: Runway Resurfacing

Posted: Sun Apr 24, 2016 10:51 am
by powerslave
Is the viewing area okay in the morning regarding the sun?

Ian

Re: Runway Resurfacing

Posted: Sun Apr 24, 2016 4:13 pm
by RACER51
notam runway 13/31 closed wip from april 25th to july 22nd.

Re: Runway Resurfacing

Posted: Mon Apr 25, 2016 6:18 am
by markymash
steve149c wrote:Runway starts this Monday, so no R31 (Rhosneigr) or R13 (Fraggle Rock) for a while

Best viewing is 19 (spotters) or a long walk to 01 (beach). Please be aware that the beach end it can be hard to see the boundary fence due to shifting dunes and trespassing on the base will be quickly dealt with.

My suggestion is Fraggle Rock in the afternoon as the sun has moved around. R19 is very nice and some
Nice shots to be had.
Thanks for the info :thumb:

Re: Runway Resurfacing

Posted: Mon Apr 25, 2016 6:29 am
by steve149c
powerslave wrote:Is the viewing area okay in the morning regarding the sun?

Ian
Hi Ian

R19 spotters car park is good viewing all day, sun can be a challenge but can also be worked around. Eg in the afternoon be at the end of the car park nearest the base and you will be less effected by sunlight on the piano keys.

Cheers

Steve

Re: Runway Resurfacing

Posted: Mon Apr 25, 2016 11:36 am
by powerslave
Thanks Steve.

Re: Runway Resurfacing

Posted: Mon Apr 25, 2016 1:35 pm
by Santiago
Hi - sorry if I am being dense.

So is there no flying @ Valley Apr- July?
We are coming up to Anglesey, 1st week June, so I guess no flying then?

Thanks

Re: Runway Resurfacing

Posted: Mon Apr 25, 2016 3:46 pm
by nickowen
Don't worry, there will still be plenty to see as the Hawks will continue to operate from the shorter runway 01/19, though there will be days when crosswinds will prevent this. Both runways will be closed briefly towards the end of the current NOTAM period as the intersection is resurfaced. Expect the Hawks to be making more use of their brake chutes.

Re: Runway Resurfacing

Posted: Thu Aug 31, 2017 10:32 pm
by Reptile 1
Runway reopened for 4 days and now closed again until end of October.

Re: Runway Resurfacing

Posted: Fri Sep 01, 2017 9:06 pm
by lowlevelRAF
Any reason for the runway closure Reptile? Ground training or issue with the tarmac?

Re: Runway Resurfacing

Posted: Sat Sep 02, 2017 10:08 am
by Red Dragon
lowlevelRAF wrote:Any reason for the runway closure Reptile? Ground training or issue with the tarmac?
It seems to be "Remedial Repair Work", about 4-6 weeks has been quoted not sure if that is solely tarmac or tarmac and familiarisation etc with new layout etc :(

Re: Runway Resurfacing

Posted: Fri Sep 08, 2017 7:23 am
by Blackcat1
So no Hawks flying until October?

Re: Runway Resurfacing

Posted: Fri Sep 08, 2017 9:50 am
by bizfreeq
Surely they will use the other runway if the weather is within limits?

Re: Runway Resurfacing

Posted: Sat Sep 09, 2017 8:08 am
by Blackcat1
Hawks should be back flying on Monday.

Re: Runway Resurfacing

Posted: Sat Sep 09, 2017 1:27 pm
by nickowen
With only one runway available, there are days, particularly at this time of year, when 01/19 will be out of crosswind limits for student pilots.

Re: Runway Resurfacing

Posted: Sat Sep 09, 2017 6:50 pm
by Blackcat1
I was told all runways open for business from Mondau?, although NOTAM says differently.

Re: Runway Resurfacing

Posted: Tue Sep 12, 2017 10:30 am
by markranger
ZK013 up at the moment from valley.

Re: Runway Resurfacing

Posted: Tue Sep 12, 2017 2:52 pm
by welshandy
Red Dragon wrote:
lowlevelRAF wrote:Any reason for the runway closure Reptile? Ground training or issue with the tarmac?
It seems to be "Remedial Repair Work", about 4-6 weeks has been quoted not sure if that is solely tarmac or tarmac and familiarisation etc with new layout etc :(
If it's was done by the same contractors that relayed the Road outside our House that had be redone after a year I'm not suprised :whistle: :whistle:

Just had 2 T2's do a low level high speed pass over our House

Re: Runway Resurfacing

Posted: Tue Sep 12, 2017 3:00 pm
by Blackcat1
Been a few Hawks up today