filmman wrote:Question, can you have a cable system that deploys and retracts at the fick of a switch.
In the (public) RC-135 operations manual, you'll find very specific and strict guidance on RC-135 operations around cables, but essentially they don't mix.
5.18.1. RC-135 aircraft will ensure all barriers and cables are removed prior to recovery. Do
not land on approach end arresting cables. If the aircraft lands before the cable, the crew
should contact the tower to have the cable inspected.
5.18.2. If time or operational constraints dictate, the aircraft commander may taxi over
approach end cables and use the remaining runway for takeoff provided the departure end
cables have been removed and the AC recalculates TOLD using actual distance remaining.